翻訳と辞書
Words near each other
・ Highway 11 (Iraq)
・ Highway 12 (Iraq)
・ Highway 12 (Israel)
・ Highway 13 (Israel)
・ Highway 15 (Jordan)
・ Highway 17 (Alberta–Saskatchewan)
・ Highway 17 Express
・ Highway 18 (TV series)
・ Highway 2 (Iraq)
・ Highway 2 (Israel)
・ Highway 2 Bridge
・ Highway 20 (Israel)
・ Highway 20 (Jordan)
・ Highway 20 Ride
・ Highway 2000, Jamaica
Highway 22 (Israel)
・ Highway 24 Bridge
・ Highway 25 (Israel)
・ Highway 25 (Jordan)
・ Highway 25 Bridge
・ Highway 25 Bridge (Minnesota)
・ Highway 3 (Iraq)
・ Highway 3 (Israel)
・ Highway 30 (Jordan)
・ Highway 301 (film)
・ Highway 31 (Israel)
・ Highway 34 (Israel)
・ Highway 35 (Israel)
・ Highway 35 (Jordan)
・ Highway 38 (Israel)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Highway 22 (Israel) : ウィキペディア英語版
Highway 22 (Israel)

Highway 22 ((ヘブライ語:כביש 22)), also known as the ''Bay Highway'', is a suburban freeway in the Haifa metropolitan area connecting downtown Haifa with the city's northern exit to the Krayot area.
The 17 km long freeway bypasses the Krayot, providing an alternative route to Highway 4. Also the interchanges connecting to the Carmel Tunnels and Highway 75 were improved as part of the project.
The highway is divided into two parts:
* ''The Kishon Road'' is a 5 km long urban section from Hiram interchange in downtown Haifa to Yigael Yadin interchange. The first stage of the Kishon Road was built by Haifa's municipal Yefe Nof company and opened in 2005. Mevo Carmel Interchange opened on January 12, 2010,〔 eliminating a dangerous railway crossing on the way to the Krayot.
* ''The Krayot Bypass'' is a 12 km long suburban section bypassing the Krayot area. There have been plans to create an alternative road to the congested Haifa - Acre road since the 1970s, however financial and bureaucratic issues prevented these plans from being realized for several decades. Shapir Marine and Civil Engineering Ltd. won the tender to construct this part of the highway, work on which commenced in 2010. The entire cost of this segment is estimated at NIS 1.9 billion (approximately US$500 million) and is managed by the National Roads Authority. Other works under way in the vicinity of the highway include the construction of connections from the highway to the Carmel Tunnels and Highway 75 and improvements to Highway 4 from the Karey Na'aman interchange to just south of Acre. The southern part of the Krayot Bypass, from Haifa to the Bialik Interchange was completed mid-September 2012, ahead of schedule.〔 The last section leading to Karei Na'aman Interchange was completed in March 2013.〔 A direct connection between the highway and the Carmel Tunnels was completed in March 2014.
== Interchanges ==


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Highway 22 (Israel)」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.